Electrical network modelling lets engineers test how an installed low-voltage system behaves under load, fault and changed operating conditions before new equipment is connected. On an existing plant, the model is only as reliable as its input data. The work therefore starts with a site survey that verifies supplies, boards, cables and protective device settings against the drawings, and records every unverified value as a stated assumption.

Electrical drawings on an established process site are usually accurate on the day they are issued. Over the following years, boards are extended, motors are replaced, protection settings are adjusted and temporary supplies become permanent. When a new production line, an electrified heating duty or a standby generator is proposed, whether the network can take it depends on what is installed today.

This article sets out how an electrical site survey and an electrical network model work together on brownfield low-voltage systems. It covers what the survey should verify, which studies the model supports, how those studies relate to duties under the Electricity at Work Regulations 1989, and how to keep the model useful after the project that funded it.

What is electrical network modelling?

Electrical network modelling builds a calculable representation of an installed electrical system, from the point of supply through transformers, switchboards, cables and protective devices to the connected loads. Engineers use it to run load flow, voltage drop, prospective fault current and protection coordination studies for defined operating cases, and to test proposed changes before they are built.

A model represents specific cases, so every conclusion is tied to the data behind it: network topology, equipment ratings, cable sizes and lengths, protective device types and settings, the supply characteristics provided by the distribution network operator (DNO), and the operating arrangements being studied. Prospective fault currents are commonly calculated using the method in IEC 60909-0, the standard for short-circuit currents in three-phase a.c. systems, which applies to both low-voltage and high-voltage systems.

For fixed installations, BS 7671 (the IET Wiring Regulations) applies up to 1000 V a.c. or 1500 V d.c. Systems above that voltage, and interfaces with high-voltage supplies, need their own standards and competence.

Why should a site survey come before the model?

On existing plants, drawings and schedules often lag behind the installation. A site survey verifies supplies, transformers, generators, switchboards, cable sizes and routes, protective device types and settings, and connected loads, so that the model reflects what is installed. Anything that cannot be confirmed is recorded as an assumption or a data gap, which keeps the limits of the study visible.

The depth of survey should follow the study objective. A capacity review for one new load may need verified data along a single supply path. A site-wide protection study needs device types and settings at every level of discrimination. An arc flash study needs clearing times and working arrangements in more detail again.

Records drift for ordinary reasons: modifications made under time pressure, replacements described as like-for-like that were not, and knowledge held by individuals. Documentation that no longer matches the installed plant is a recurring finding in an ageing plant assessment, and electrical distribution is one of the systems where the gap matters most. 

Electrical verification follows the same principle as checking piping layouts against legacy drawings with laser scanning: establish the installed condition before designing changes to it. Where a survey is outside the scope, a structured documentation review with a formal request for information (RFI) can still define what is known, as in this EC&I cost baseline built from existing project records. The outputs then carry the uncertainty that a survey would have removed.

What can a network model assess?

A verified model supports four main groups of study: load flow and voltage drop, prospective fault current, protection coordination, and cable and equipment suitability. Each answers a different question about whether the installed system can carry its duty safely, and each depends on a different subset of the survey data. That is why the study scope should be agreed before the survey begins.

Load flow and voltage drop

Load flow analysis calculates current, power flow and voltage throughout the network for a specified operating case. It identifies overloaded transformers, boards and cables, voltages outside acceptable limits, and the constraints a proposed load would create. Motor starting is checked as a separate case, because starting current can depress voltage on shared supplies.

Prospective fault current, maximum and minimum

Fault studies estimate the current that would flow for a short circuit at each point of interest, and two values matter. The maximum prospective fault current tests whether switchgear and protective devices can withstand and interrupt the fault. HSE guidance lists the contribution of connected motors to fault level among the factors to consider. The minimum fault current, typically at the far end of a circuit or under earth fault conditions, tests whether protection will operate quickly enough.

Protection coordination and discrimination

Coordination review checks whether the device nearest a fault operates first, leaving upstream supplies in service. HSE guidance calls for protective devices to be set for the minimum tripping currents and times consistent with reliable operation and discrimination between stages. The review may identify setting changes, devices that cannot discriminate with their neighbours, or areas that need more detailed study.

Cable and equipment suitability

Cable checks consider design current, conductor material and size, length, installation method, grouping, ambient temperature, protective device rating, voltage drop and fault withstand. Inspection and testing may still be needed to confirm condition and any parameters that records cannot establish.

How the studies support duties under the Electricity at Work Regulations

The Electricity at Work Regulations 1989 require systems to be constructed and maintained to prevent danger so far as is reasonably practicable (regulation 4), prohibit putting equipment into use where its strength and capability may be exceeded in a way that gives rise to danger (regulation 5), and require efficient means of protection from excess current (regulation 11). HSE’s guidance on the Regulations, HSR25, lists the likely load and fault conditions, the fault level at the point of supply and motor contributions among the factors to consider when assessing a system’s construction.

A network model gives the duty holder an auditable basis for the engineering judgements those duties require. The table shows how each study connects to the data it needs and the duty it informs.

Study Question it answers Key survey data Duty it informs (EAWR 1989)
Load flow Can supplies, transformers, boards and cables carry the demand in each operating case? Connected loads, diversity, operating configurations, cable sizes and lengths Regulation 4(1), construction
Voltage drop and motor starting Does voltage stay within limits during running and starting? Cable impedances, motor ratings and starting methods, source impedance Regulation 4(1), construction
Maximum prospective fault current Can switchgear and protective devices withstand and break the worst-case fault? DNO supply fault level, transformer impedance, motor contribution, device ratings Regulation 5, strength and capability
Minimum fault current and earth fault loop impedance Will protection operate quickly enough at the end of each circuit? Earthing arrangement, cable lengths and sizes, device characteristics Regulations 8 and 11, earthing and excess current
Protection coordination Does the device nearest the fault clear it first? Device types, ratings, settings and time-current characteristics Regulation 11, excess current protection
Cable suitability Is each cable adequate thermally and under fault? Installation method, grouping, ambient conditions, device ratings Regulations 4(1) and 5
Model maintenance Does the record still match the installed system? Change records, controlled as-built drawings Regulation 4(2), maintenance

Table prepared by IDEA for this article. Regulation references from legislation.gov.uk.

How should a model be used before plant expansion or electrification?

Before equipment is ordered, a verified model can test a proposed load against the existing network. The study checks supply, transformer, switchgear and cable capacity; voltage during running and motor starting; prospective fault levels against equipment ratings; and protection discrimination across normal, alternative, maintenance and standby configurations. The output is a defined list of enabling works for the project scope.

Typical changes include larger motors, additional process lines, new heating or cooling loads, standby generation and revised distribution arrangements. Every operating configuration that changes power flow, fault level or protection behaviour should be studied, since a generator running in parallel or a bus section closed for maintenance can give a different answer from normal operation. HSE guidance also notes that whoever raises the fault level on a system, for example by connecting additional generation, can take on duties for the danger that creates elsewhere in it.

Electrification of thermal duties is now a frequent source of new electrical load. In a process-led approach to decarbonisation, the process defines the duty first and the electrical study then confirms what the network needs to deliver it. Running that check at feasibility stage gives the investment decision a realistic view of enabling costs, which is the purpose of a feasibility study as decision-support.

On distillery and spirits sites, new loads often sit within or near areas classified under DSEAR 2002, so electrical changes also need checking against the hazardous area classification.

Limitations, data quality and keeping the model current

A model is an engineering representation of defined cases. Its report should state the data sources, assumptions, operating scenarios and limits of each conclusion. Nameplate data, device settings, cable routes and supply fault information are often incomplete. Sensitivity cases show which uncertainties change the result, and therefore where field verification is worth its cost. For existing low-voltage systems, IEC 60909-0 recognises that short-circuit impedance can be determined by measurement at the location considered, which can close a gap that records cannot.

A model does not replace statutory inspection and testing, safe systems of work or site procedures. It supports specified engineering assessments within an agreed scope.

The model keeps its value when it is maintained alongside controlled as-built drawings. A change process should capture new loads, cables, transformers, device replacements, setting changes and revised operating arrangements. HSE guidance recommends keeping maintenance records, including test results, throughout the working life of a system, and a current model is a practical extension of that record.

Which edition of BS 7671 applies?

Confirm the applicable edition for each project. BS 7671:2018+A4:2026 was published on 15 April 2026, and the previous edition, BS 7671:2018+A2:2022+A3:2024, was withdrawn on 15 October 2026. New design work should therefore be specified to Amendment 4. HSE guidance confirms that an installation designed to an earlier edition, current at the time, does not fail to comply with the 1989 Regulations for that reason alone. The IET’s BS 7671 guidance sets out the changes.

What this means in practice, and how IDEA can help

A survey and study should deliver:

  • Verified as-built drawings and equipment schedules, with discrepancies recorded.
  • A maintainable network model with stated assumptions, data quality and operating configurations.
  • An assessment report covering voltage performance, fault levels, protection, cable and equipment concerns and capacity constraints.
  • A prioritised register of risks, missing data, further investigations and recommended modifications.

For an initial discussion, it helps to have existing drawings, equipment and cable schedules, protection settings and test records; normal and alternative operating configurations, known constraints and recent changes; and the proposed loads, motor starting requirements, programme, shutdown access and required study outputs.

IDEA provides low-voltage electrical design and engineering for process plants up to 1000 V a.c., including load schedules and power studies modelled in ElectricalOM, cable sizing, protection coordination and earthing design. Where high-voltage systems are involved, we work alongside high-voltage specialists. [EVIDENCE REQUIRED: one anonymised delivered survey or study, by sector and region, with at least one real figure.] To discuss survey scope and study outputs for your site, contact our electrical engineering team.

Frequently Asked Questions

Historic drawings and schedules often omit later modifications or carry outdated equipment data. A survey establishes a verified baseline, and any value that cannot be confirmed is recorded as an assumption or data gap so the study’s limits are visible.

A suitable model supports load flow, voltage drop, prospective fault current and protection coordination studies, along with cable and equipment suitability checks. The scope of each conclusion depends on the available data, the operating cases studied and the calculation method used.

No. A model represents defined operating and fault cases. Inspection and testing are still needed to confirm equipment condition, settings and parameters that records cannot establish reliably.

After any permanent change to loads, cables, transformers, generators, protective devices, settings or operating arrangements. Maintaining it through a controlled change process means each future project starts from a reliable baseline.