A spirits producer engaged IDEA to develop and deliver a new spirit supply system for a bottling line, replacing an existing supply arrangement and supporting a target throughput of 450 bottles per minute. The project was delivered through multiple work packages, covering detailed engineering design, procurement support, hazardous area classification and a turnkey scope for two buffer tank skid systems, including fabrication, installation and commissioning.
At a glance
- Sector: Distilled Spirits
- Scope: Detailed design, procurement support, HAC and turnkey delivery of two buffer tank skids
- Disciplines: Process, mechanical, EC&I engineering and process safety
- Outcome: A coordinated design taken through to fabricated, commissioned equipment
Client Overview
The client is a spirits producer replacing the spirit supply arrangement for a bottling line to support a target throughput of 450 bottles per minute.
The project was delivered through multiple work packages, covering design, procurement support, hazardous area classification and turnkey delivery of critical equipment.
The challenge: from replacement design to fabricated equipment
The challenge was to replace the existing spirit supply equipment with a system capable of reliably feeding the target throughput, coordinating a multidisciplinary design while progressing into procurement and, for some packages, fabrication and commissioning.
- Replacing the existing spirit supply equipment with a new system capable of reliably feeding the line at the target throughput.
- Coordinating a multidisciplinary design across process, mechanical, EC&I and process safety, while maintaining alignment with CDM responsibilities and site standards.
- Managing interfaces with the filler system and existing control architecture, while futureproofing for a future dedicated supply line.
- Progressing from design into procurement and, for defined packages, into fabrication, installation and commissioning, without losing design intent.
IDEA's role
IDEA structured the work into phased delivery, from detailed design and safety studies through to procurement support and turnkey delivery of critical skids.
- Reviewed existing documentation, issued RFIs and completed site surveys to confirm constraints and tie-ins.
- Completed HAZOP and LOPA on site and delivered hazardous area classification outputs.
- Produced technical bid evaluations, updated datasheets and generated fabrication isometrics and construction packs.
- Managed controlled change through structured project change control where site and control system realities required updates.
What we delivered
The delivered package spanned detailed design and safety studies, procurement support, and turnkey delivery of two buffer tank skids.
- New P&IDs, Basis of Design, control philosophy, sizing calculations, equipment and instrument lists, and a 3D model.
- HAZOP, LOPA and hazardous area classification drawings for the new equipment.
- Procurement strategy, technical bid evaluation, updated specifications and fabrication isometrics for two buffer tank skids.
- Turnkey fabrication, power and control panel build, FAT and SAT activities, shipment and installation, including a new stairwell at the equipment location.
- As-built documentation updates, including inspection and testing outputs and CompEx certification.
Results and outcome
The project progressed with a coordinated, multidisciplinary design basis, reduced delivery risk, and strengthened compliance confidence as it moved from design into execution.
- Enabled progression of the upgrade with a coordinated, multidisciplinary design basis, reducing interface uncertainty.
- Reduced delivery risk by linking procurement and fabrication outputs directly back to the engineered design.
- Strengthened compliance confidence through integrated process safety studies, supporting equipment selection and safe operation.
Why IDEA for bottling line supply upgrades
IDEA delivers bottling line supply upgrades from concept design through to fabricated, commissioned equipment, keeping design intent intact through execution.
- Phased delivery model spanning design, procurement and turnkey fabrication.
- Integrated process safety studies embedded into equipment selection.
- Controlled change management to protect design intent through execution.
- Experience interfacing with existing filler and control systems.
Frequently Asked Questions
A spirit supply upgrade typically involves detailed design of new pipework, buffer tanks and controls to reliably feed a bottling line at its target throughput, along with procurement support and, in some cases, turnkey fabrication and installation of critical equipment.
Phased work packages allow detailed design and safety studies to be completed and reviewed before committing to procurement and fabrication, while still allowing a single team to carry design intent through to installation for critical items.
A turnkey buffer tank skid package typically includes procurement and fabrication of the skid, power and control panel build, factory and site acceptance testing, shipment, installation, and updating documentation to as-built status.
New spirit supply equipment can introduce new hazards and flammable atmosphere risks. HAZOP identifies and assesses these hazards, while hazardous area classification defines the zoning basis for safe equipment selection.
Design intent is protected by linking procurement and fabrication documentation directly back to the engineered design, including updated datasheets, model updates and fabrication isometrics, and by managing any necessary changes through structured project change control.